All CoursesUpcoming-Courses/ExamsMasterclassIR Certification
IndustryReady Assessment 2.0
IndustryReady Assessment (IR Assessment) 2.0 is an employability test
to assess students practical civil engineering knowledge and their
logical abilities.
Basic understanding and terms related to E-tabs. Load
calculation of G+10 building in E-tabs. Understanding how
a structure behaves during different loading conditions.
Understanding roles and responsibility of a quality
surveyor. Preparation of bill of quantity from approved
drawings. Factors affecting rate of materials.
Understanding different phases of project management.
Understanding the basics and applications of CPM and PERT.
Different constrains of turns during execution of project.
Structural design is a highly specialized area of civil
engineering. It can be described as a set of methods or
tools that are used to determine safe and economical
specifications for a structure, and to ensure that a
planned structure will be sufficiently strong to carry its
intended load.
Interior design is the art and science of enhancing the
interior of a building to achieve a healthier and more
aesthetically pleasing environment for the people using
the space.
In this course we (or you) will learn about execution of
piling works at site with the help of videos and pictorial
representations. Piles are the structural elements which
transfer all loads of structure (Buildings, Bridges, ports
etc) to the soil safely.
Building Information Modeling (BIM) is a process that
begins with the creation of an intelligent 3D model and
enables document management, coordination and simulation
during the entire lifecycle of a project (plan, design,
build, operation and maintenance).
Autodesk Revit is a building information modeling software
for architects, landscape architects, structural
engineers, mechanical, electrical, and plumbing (MEP)
engineers, designers and contractors.
Tendering is a process where are an organization responds
to a request for information or pricing related to the
supply of goods and services from another organization.
Project Monitoring refers to the process of keeping track
of all project-related metrics including team performance
and task duration, identifying potential problems and
taking corrective actions necessary to ensure that the
project is within scope, on budget and meets the specified
deadlines.
QA/QC is the combination of quality assurance and quality
control, the process or set of processes used to measure
and assure the quality of a product, and quality control,
the process of ensuring products and services meet
consumer expectations.